04 / 05 · INFRACORE

Energy & Critical Infrastructure

Design and installation of electrical infrastructure, UPS, generators and backup systems sized from the actual consumption of your operation, so that an electrical failure never becomes an hour of stoppage.

Calculate my critical load

See what’s included

04 / 05 · INFRACORE

Energy & Critical Infrastructure

Design and installation of electrical infrastructure, UPS, generators and backup systems sized from the actual consumption of your operation, so that an electrical failure never becomes an hour of stoppage.

Calculate my critical load

See what’s included

04 / 05 · INFRACORE

Energy & Critical Infrastructure

Design and installation of electrical infrastructure, UPS, generators and backup systems sized from the actual consumption of your operation, so that an electrical failure never becomes an hour of stoppage.

Calculate my critical load

See what’s included

04 / 05 · INFRACORE

Energy & Critical Infrastructure

Design and installation of electrical infrastructure, UPS, generators and backup systems sized from the actual consumption of your operation, so that an electrical failure never becomes an hour of stoppage.

Calculate my critical load

See what’s included

+0

years in operation

+0

projects completed

+0

satisfied customers

A single contract for the physical space and its technological operation: InfraCore builds, IT Solutions operates.

+0

years in operation

+0

projects completed

+0

satisfied customers

A single contract for the physical space and its technological operation: InfraCore builds, IT Solutions operates.

+0

years in operation

+0

projects completed

+0

satisfied customers

A single contract for the physical space and its technological operation: InfraCore builds, IT Solutions operates.

+0

years in operation

+0

projects completed

+0

satisfied customers

A single contract for the physical space and its technological operation: InfraCore builds, IT Solutions operates.

WHY CHOOSE US

If you are looking for a partner to design your energy so that your operations never stop, you are in the right place

Every project begins with a load calculation based on actual on-site measured consumption: backup, redundancy, and autonomy are dimensioned before a single piece of equipment is specified.

01

Load calculation before equipment

It is delivered as part of the executive project, based on the actual consumption measured on-site, before specifying any equipment.

02

UPS, generators, and hybrid systems

Online double-conversion UPS (Schneider Electric APC, Vertiv Liebert, Eaton), emergency generators, and automatic transfer switches (ATS).

03

Dedicated distribution for IT

Dedicated panels, isolated ground, and intelligent PDUs with outlet-level consumption monitoring.

04

Regulatory compliance

Compliance with applicable regulations and standards (such as NOM, NFPA, and TIA, among others), tailoring our approach to the requirements of each client.

05

Semi-annual preventive maintenance

Includes UPS load testing and generator load bank startup to ensure that the backup system works when needed.

06

Critical power in demanding environments

Manufacturing plants, distribution centers, and corporate data centers.

WHY CHOOSE US

If you are looking for a partner to design your energy so that your operations never stop, you are in the right place

Every project begins with a load calculation based on actual on-site measured consumption: backup, redundancy, and autonomy are dimensioned before a single piece of equipment is specified.

01

Load calculation before equipment

It is delivered as part of the executive project, based on the actual consumption measured on-site, before specifying any equipment.

02

UPS, generators, and hybrid systems

Online double-conversion UPS (Schneider Electric APC, Vertiv Liebert, Eaton), emergency generators, and automatic transfer switches (ATS).

03

Dedicated distribution for IT

Dedicated panels, isolated ground, and intelligent PDUs with outlet-level consumption monitoring.

04

Regulatory compliance

Compliance with applicable regulations and standards (such as NOM, NFPA, and TIA, among others), tailoring our approach to the requirements of each client.

05

Semi-annual preventive maintenance

Includes UPS load testing and generator load bank startup to ensure that the backup system works when needed.

06

Critical power in demanding environments

Manufacturing plants, distribution centers, and corporate data centers.

WHY CHOOSE US

If you are looking for a partner to design your energy so that your operations never stop, you are in the right place

Every project begins with a load calculation based on actual on-site measured consumption: backup, redundancy, and autonomy are dimensioned before a single piece of equipment is specified.

01

Load calculation before equipment

It is delivered as part of the executive project, based on the actual consumption measured on-site, before specifying any equipment.

02

UPS, generators, and hybrid systems

Online double-conversion UPS (Schneider Electric APC, Vertiv Liebert, Eaton), emergency generators, and automatic transfer switches (ATS).

03

Dedicated distribution for IT

Dedicated panels, isolated ground, and intelligent PDUs with outlet-level consumption monitoring.

04

Regulatory compliance

Compliance with applicable regulations and standards (such as NOM, NFPA, and TIA, among others), tailoring our approach to the requirements of each client.

05

Semi-annual preventive maintenance

Includes UPS load testing and generator load bank startup to ensure that the backup system works when needed.

06

Critical power in demanding environments

Manufacturing plants, distribution centers, and corporate data centers.

WHY CHOOSE US

If you are looking for a partner to design your energy so that your operations never stop, you are in the right place

Every project begins with a load calculation based on actual on-site measured consumption: backup, redundancy, and autonomy are dimensioned before a single piece of equipment is specified.

01

Load calculation before equipment

It is delivered as part of the executive project, based on the actual consumption measured on-site, before specifying any equipment.

02

UPS, generators, and hybrid systems

Online double-conversion UPS (Schneider Electric APC, Vertiv Liebert, Eaton), emergency generators, and automatic transfer switches (ATS).

03

Dedicated distribution for IT

Dedicated panels, isolated ground, and intelligent PDUs with outlet-level consumption monitoring.

04

Regulatory compliance

Compliance with applicable regulations and standards (such as NOM, NFPA, and TIA, among others), tailoring our approach to the requirements of each client.

05

Semi-annual preventive maintenance

Includes UPS load testing and generator load bank startup to ensure that the backup system works when needed.

06

Critical power in demanding environments

Manufacturing plants, distribution centers, and corporate data centers.

WHY CHOOSE US

The most frequent challenges in the critical electrical infrastructure of medium-sized and multinational companies

In operations where an outage has a measurable cost, the same scenarios lead to a review of the electrical infrastructure:

Designing critical electrical infrastructure from actual consumption and with periodic preventive maintenance is the difference between a backup that works and one that is only installed.

01

Electrical drops or variations that have already stopped the operation, with a cost per hour that someone in the company has already calculated.

02

Expansion of the operation that exceeded the originally installed electrical capacity.

03

New construction where the critical load was not dimensioned from the design, generating more expensive subsequent adjustments.

04

Backup systems installed without calculation of real autonomy, without certainty that they will work when an outage occurs.

05

Electrical rooms without monitoring or documentation, where a fault is detected when it has already caused damage.

WHY CHOOSE US

The most frequent challenges in the critical electrical infrastructure of medium-sized and multinational companies

In operations where an outage has a measurable cost, the same scenarios lead to a review of the electrical infrastructure:

Designing critical electrical infrastructure from actual consumption and with periodic preventive maintenance is the difference between a backup that works and one that is only installed.

01

Electrical drops or variations that have already stopped the operation, with a cost per hour that someone in the company has already calculated.

02

Expansion of the operation that exceeded the originally installed electrical capacity.

03

New construction where the critical load was not dimensioned from the design, generating more expensive subsequent adjustments.

04

Backup systems installed without calculation of real autonomy, without certainty that they will work when an outage occurs.

05

Electrical rooms without monitoring or documentation, where a fault is detected when it has already caused damage.

WHY CHOOSE US

The most frequent challenges in the critical electrical infrastructure of medium-sized and multinational companies

In operations where an outage has a measurable cost, the same scenarios lead to a review of the electrical infrastructure:

Designing critical electrical infrastructure from actual consumption and with periodic preventive maintenance is the difference between a backup that works and one that is only installed.

01

Electrical drops or variations that have already stopped the operation, with a cost per hour that someone in the company has already calculated.

02

Expansion of the operation that exceeded the originally installed electrical capacity.

03

New construction where the critical load was not dimensioned from the design, generating more expensive subsequent adjustments.

04

Backup systems installed without calculation of real autonomy, without certainty that they will work when an outage occurs.

05

Electrical rooms without monitoring or documentation, where a fault is detected when it has already caused damage.

WHY CHOOSE US

The most frequent challenges in the critical electrical infrastructure of medium-sized and multinational companies

In operations where an outage has a measurable cost, the same scenarios lead to a review of the electrical infrastructure:

Designing critical electrical infrastructure from actual consumption and with periodic preventive maintenance is the difference between a backup that works and one that is only installed.

01

Electrical drops or variations that have already stopped the operation, with a cost per hour that someone in the company has already calculated.

02

Expansion of the operation that exceeded the originally installed electrical capacity.

03

New construction where the critical load was not dimensioned from the design, generating more expensive subsequent adjustments.

04

Backup systems installed without calculation of real autonomy, without certainty that they will work when an outage occurs.

05

Electrical rooms without monitoring or documentation, where a fault is detected when it has already caused damage.

THE SERVICE

What's included

The service covers the entire technology strategy cycle, from assessment to target architecture.

01

Dedicated Distribution and Physical Land

Boards for IT, substations when the project requires it, and separate physical ground for sensitive equipment.

02

Critical Power Solutions

Integration of ATS, PDUs, and other power distribution and monitoring systems

03

UPS and generators

Double-conversion online UPS and gas or diesel generators, in hybrid configuration when maximum continuity is required.

04

Load and range calculation

According to actual consumption measured, criticality of the operation and growth projection in 3 years.

05

Electrical and technical rooms

Maintenance access on all fronts, air conditioning, signage, consumption monitoring and updated one-line diagram.

06

Regulatory Compliance

Compliance with applicable regulations and standards (such as NOM-001-SEDE, NFPA 70, TIA-942, and NFPA 110, among others), tailoring our approach to each client’s requirements.

07

Post-installation maintenance

Six-monthly preventive maintenance contracts once the infrastructure has been delivered.

THE SERVICE

What's included

The service covers the entire technology strategy cycle, from assessment to target architecture.

01

Dedicated Distribution and Physical Land

Boards for IT, substations when the project requires it, and separate physical ground for sensitive equipment.

02

Critical Power Solutions

Integration of ATS, PDUs, and other power distribution and monitoring systems

03

UPS and generators

Double-conversion online UPS and gas or diesel generators, in hybrid configuration when maximum continuity is required.

04

Load and range calculation

According to actual consumption measured, criticality of the operation and growth projection in 3 years.

05

Electrical and technical rooms

Maintenance access on all fronts, air conditioning, signage, consumption monitoring and updated one-line diagram.

06

Regulatory Compliance

Compliance with applicable regulations and standards (such as NOM-001-SEDE, NFPA 70, TIA-942, and NFPA 110, among others), tailoring our approach to each client’s requirements.

07

Post-installation maintenance

Six-monthly preventive maintenance contracts once the infrastructure has been delivered.

THE SERVICE

What's included

The service covers the entire technology strategy cycle, from assessment to target architecture.

01

Dedicated Distribution and Physical Land

Boards for IT, substations when the project requires it, and separate physical ground for sensitive equipment.

02

Critical Power Solutions

Integration of ATS, PDUs, and other power distribution and monitoring systems

03

UPS and generators

Double-conversion online UPS and gas or diesel generators, in hybrid configuration when maximum continuity is required.

04

Load and range calculation

According to actual consumption measured, criticality of the operation and growth projection in 3 years.

05

Electrical and technical rooms

Maintenance access on all fronts, air conditioning, signage, consumption monitoring and updated one-line diagram.

06

Regulatory Compliance

Compliance with applicable regulations and standards (such as NOM-001-SEDE, NFPA 70, TIA-942, and NFPA 110, among others), tailoring our approach to each client’s requirements.

07

Post-installation maintenance

Six-monthly preventive maintenance contracts once the infrastructure has been delivered.

THE SERVICE

What's included

The service covers the entire technology strategy cycle, from assessment to target architecture.

01

Dedicated Distribution and Physical Land

Boards for IT, substations when the project requires it, and separate physical ground for sensitive equipment.

02

Critical Power Solutions

Integration of ATS, PDUs, and other power distribution and monitoring systems

03

UPS and generators

Double-conversion online UPS and gas or diesel generators, in hybrid configuration when maximum continuity is required.

04

Load and range calculation

According to actual consumption measured, criticality of the operation and growth projection in 3 years.

05

Electrical and technical rooms

Maintenance access on all fronts, air conditioning, signage, consumption monitoring and updated one-line diagram.

06

Regulatory Compliance

Compliance with applicable regulations and standards (such as NOM-001-SEDE, NFPA 70, TIA-942, and NFPA 110, among others), tailoring our approach to each client’s requirements.

07

Post-installation maintenance

Six-monthly preventive maintenance contracts once the infrastructure has been delivered.

STEP-BY-STEP GUIDE

How we work

The project always starts from the load calculation, before specifying any equipment.

STEP 01

Inventory and measurement

Equipment inventory with actual consumption measured on-site.

STEP 02

Definition of autonomy

According to the criticality of each load and the 3-year growth projection.

STEP 03

Delivery and presentation

The three documents and the presentation to the management team.

STEP 04

Roadmap proposal

Initiatives ranked by impact and estimated investment by time horizon.

STEP 05

Support

The same team implements, operates and supports what it has designed.

STEP-BY-STEP GUIDE

How we work

The project always starts from the load calculation, before specifying any equipment.

STEP 01

Inventory and measurement

Equipment inventory with actual consumption measured on-site.

STEP 02

Definition of autonomy

According to the criticality of each load and the 3-year growth projection.

STEP 03

Delivery and presentation

The three documents and the presentation to the management team.

STEP 04

Roadmap proposal

Initiatives ranked by impact and estimated investment by time horizon.

STEP 05

Support

The same team implements, operates and supports what it has designed.

STEP-BY-STEP GUIDE

How we work

The project always starts from the load calculation, before specifying any equipment.

STEP 01

Inventory and measurement

Equipment inventory with actual consumption measured on-site.

STEP 02

Definition of autonomy

According to the criticality of each load and the 3-year growth projection.

STEP 03

Delivery and presentation

The three documents and the presentation to the management team.

STEP 04

Roadmap proposal

Initiatives ranked by impact and estimated investment by time horizon.

STEP 05

Support

The same team implements, operates and supports what it has designed.

STEP-BY-STEP GUIDE

How we work

The project always starts from the load calculation, before specifying any equipment.

STEP 01

Inventory and measurement

Equipment inventory with actual consumption measured on-site.

STEP 02

Definition of autonomy

According to the criticality of each load and the 3-year growth projection.

STEP 03

Delivery and presentation

The three documents and the presentation to the management team.

STEP 04

Roadmap proposal

Initiatives ranked by impact and estimated investment by time horizon.

STEP 05

Support

The same team implements, operates and supports what it has designed.

DIFFERENTIATORS

What sets us apart

An electrical installer delivers power; InfraCore delivers an infrastructure ready to support operations, with critical load, backup, and redundancy defined from the design stage.

Sizing based on actual consumption

Critical load, backup, and redundancy are defined with on-site measurements, not estimates.

One team, one contract

All infrastructure works in an integrated manner, with sole responsibility for the result.

Maintenance is part of the service

Periodic preventive maintenance is the only way to guarantee that the backup works when needed; it is not an extra.

Highly critical environments

Manufacturing plants, distribution centers, and corporate data centers in Mexico.

DIFFERENTIATORS

What sets us apart

An electrical installer delivers power; InfraCore delivers an infrastructure ready to support operations, with critical load, backup, and redundancy defined from the design stage.

Sizing based on actual consumption

Critical load, backup, and redundancy are defined with on-site measurements, not estimates.

One team, one contract

All infrastructure works in an integrated manner, with sole responsibility for the result.

Maintenance is part of the service

Periodic preventive maintenance is the only way to guarantee that the backup works when needed; it is not an extra.

Highly critical environments

Manufacturing plants, distribution centers, and corporate data centers in Mexico.

DIFFERENTIATORS

What sets us apart

An electrical installer delivers power; InfraCore delivers an infrastructure ready to support operations, with critical load, backup, and redundancy defined from the design stage.

Sizing based on actual consumption

Critical load, backup, and redundancy are defined with on-site measurements, not estimates.

One team, one contract

All infrastructure works in an integrated manner, with sole responsibility for the result.

Maintenance is part of the service

Periodic preventive maintenance is the only way to guarantee that the backup works when needed; it is not an extra.

Highly critical environments

Manufacturing plants, distribution centers, and corporate data centers in Mexico.

DIFFERENTIATORS

What sets us apart

An electrical installer delivers power; InfraCore delivers an infrastructure ready to support operations, with critical load, backup, and redundancy defined from the design stage.

Sizing based on actual consumption

Critical load, backup, and redundancy are defined with on-site measurements, not estimates.

One team, one contract

All infrastructure works in an integrated manner, with sole responsibility for the result.

Maintenance is part of the service

Periodic preventive maintenance is the only way to guarantee that the backup works when needed; it is not an extra.

Highly critical environments

Manufacturing plants, distribution centers, and corporate data centers in Mexico.

Ready to strengthen your company's infrastructure?

We design infrastructures that support current operations and prepare your organization for future challenges.

Ready to strengthen your company's infrastructure?

We design infrastructures that support current operations and prepare your organization for future challenges.

Ready to strengthen your company's infrastructure?

We design infrastructures that support current operations and prepare your organization for future challenges.

Ready to strengthen your company's infrastructure?

We design infrastructures that support current operations and prepare your organization for future challenges.